Example of Shimizu Tunnel No 3 in UDEC 7.00

Programvara

Version Notes:
UDEC 7.00

Level: Intermediate
Runs in Demo: No

Write Up
Walk Through
Project Files
Konsulttjänster
This example demonstrates the use of UDEC to model a tunnel excavation in a jointed rock mass.

This example demonstrates the use of UDEC to model a tunnel excavation in jointed rock mass. In this demonstration, geometry sets are used to create the tunnel geometry. The Barton Bandis model is used to represent the joints. The "block solve relax" command is used to simulate the pre-relaxation of the rock mass while excavating the tunnel.

Keywords

  • Geometry sets
  • Barton-Bandis
  • Ground reaction curve
  • Shotcrete
  • Bolt
Senaste nytt

Kommande händelser
25 feb.
Débuter avec FLAC2D/FLAC3D
This training is an introduction to continuous modeling with FLAC2D and FLAC3D. At the end of the course, participants will master the ... Läs mer
11 mars
Getting Started with 3DEC
Objectives of the training: Understand the 3DEC numerical approach and the types of problems it can solveKnow how to manipulate the 3DE... Läs mer
26 mars
Python in Itasca Software
... Läs mer