Dewatered Construction of a Braced Excavation

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A braced excavation is constructed in saturated ground. The construction stages, dewatering, excavation and braced support construction are simulated with FLAC. The purpose is to evaluate the deformation of the ground adjacent to the excavation and the performance of the wall and strut support. Three different material constitutive models are used to represent the soil behavior: Mohr-Coulomb, Cysoil, and PH models. The deformational response produced by these three models are compared.

Keywords:

  • Braced excavation
  • Saturated soil
  • Horizontal struts
  • Diaphram wall
  • support
  • Dewatering
  • Mohr-Coulomb model
  • Cysoil model
  • PH model
  • Plastic
  • Hardening
  • Construction sequence
  • Excavation
  • Settlement

Materials:

  • Clay
  • Sand
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • Newsletter October 2023 ...
    Read More
  • Newsletter August 2023 ...
    Read More
  • New General Manager for ITASCA Sweden We have appointed a new GM in Sweden!...
    Read More

Upcoming Events
29 Oct
Getting Started with 3DEC
Objectives of the training: Understand the 3DEC numerical approach and the types of problems it can solveKnow how to manipulate the 3DE... Read More
5 Nov
Python in Itasca Software
This course provides an overview of the Python programming language in Itasca software.The course covers major applications of Python t... Read More
19 Nov
Getting Started with FLAC2D/FLAC3D
This training is an introduction to continuous modeling with FLAC2D and FLAC3D. At the end of the course, participants will master the ... Read More