Analysis of a Concrete Diaphragm Wall

Software

Version Notes:
FLAC 8.0

Level: Intermediate
Runs in Demo: Yes

Write Up
Walk Through
Project Files
Consulting Services

The stages of construction of a concrete diaphragm wall are simulated with FLAC. The analysis begins with the concrete diaphragm wall cast in place. Dewatering, excavation and installation of support struts are simulated in five excavation stages. Distribution of shear forces and bending moments in the wall, axial forces in the struts and displacements of the soil behind the wall are calculated during the five stages.

Keywords

  • Multistage excavation
  • Dewatering
  • Concrete diaphragm wall
  • Support struts
  • Importing stratigraphy geometry
  • Beam elements
  • Interfaces
  • Large strain
  • Mohr-Coulomb model

Materials

  • Concrete
  • Soil

Analyses

  • Fluid Flow
  • Static
Latest News
  • Newsletter October 2023 ...
    Read More
  • Newsletter August 2023 ...
    Read More
  • New General Manager for ITASCA Sweden We have appointed a new GM in Sweden!...
    Read More

Upcoming Events
25 Feb
Débuter avec FLAC2D/FLAC3D
This training is an introduction to continuous modeling with FLAC2D and FLAC3D. At the end of the course, participants will master the ... Read More
11 Mar
Débuter avec 3DEC
Objectives of the training: Understand the 3DEC numerical approach and the types of problems it can solveKnow how to manipulate the 3DE... Read More
26 Mar
Python in Itasca Software
This course provides an overview of the Python programming language in Itasca software.The course covers major applications of Python t... Read More