Selected Projects

Search Phrase
Plats
Programvara
Industry

Sjömalmen — Cave Modeling and Prediction of Ground Deformations (2017)

The city of Kiruna is partly located on the hanging wall side of the LKAB Kiirunavaara Mine. In the long-term perspective, it is not possible to have any residential buildings or infrastructure within the fracture zone and cave zone resulting from mining. An urban transformation process for the Kiruna city center is thus currently underway. The current prognosis is empirical based on observations since the early 1960s until today.

Seismic Deformation Analyses of a Hydraulic Fill Embankment Dam (2017)

As part of evaluation of seismic performance of this 175-foot high hydraulic fill dam located at a confidential site in the southeast Appalachia region, Geosyntec hired Itasca Consulting Group (Itasca) to perform deformation analyses for seismic loading of the dam using numerical modeling. Prior to the deformation analyses, Itasca also assisted Geosyntec with numerical simulations to assess the liquefaction potential of the dam using the cyclic stress ratio approach.

Karowe Mine Groundwater Flow Model and Predictive Dewatering Simulations (2017)

Karowe Mine, located approximately 16 kilometers (km) southwest of the town of Letlhakane, is a diamond mine where the second largest diamond ever found on record, with a weight of 1,111 carats, was discovered. This project involved simulating mine dewatering and excavation to evaluate future dewatering requirements, as well as providing guidance for future monitoring borehole and piezometer designs.

Rock Mechanics Study for the Kevitsa Strategy Project (2017)

The Kevitsa open pit mine has been in operation since 2012 and was acquired by Boliden in 2016. A new strategic plan is currently being developed to investigate an increase in production. In conjunction with this, the geotechnical slope design parameters for the final pit depth, including a possibly deeper pit, need to be analyzed.

Investigation of Mine Access Tailings Storage in an Open Pit (2017)

The mine is interested in using the decommissioned open pit for storage of tailings from the underground mine, as this would be beneficial both from an environmental and an economical perspective. The implementation will be a technical challenge since portions of the crown pillar separating the open pit from the underground mining has been extracted.

Mechanical testing of a model baked anode material with PFC (2017)

A baked anode is a complex material, that results from the mixing and baking of different petrol coke grains, with different size distributions, with a pitch. A preliminary study (ICSAS16-CST-MFG-35143-01) developed a PFC2D model accounting for the microstructure of a baked anode, using the Bonded Particle Model (BPM).

Dynamic Soil Structure Interaction Analyses of North Shore Pump Station (2017)

Located near Fisherman’s Wharf in San Francisco, North Shore Pump Station is a part of the North Point Wet-Weather Facility (NPF), which provides primary treatment for disinfection of wastewater. The facility is a two-story building that is completely embedded in soil, and the subsurface conditions include potentially liquefiable sand layers and soft Bay Mud deposits sitting on bedrock sloping toward the east side waterfront. The building is supported by piers extending all the way into the Franciscan Complex bedrock.

Rock Mechanic Analysis for Crown Pillar Extraction at Tara (2017)

Boliden Tara Mines is Europe’s largest zinc mine, with an annual production of 2.6 million tones of ore, and has been in operation since 1977. This project was part of the required planning application to the authorities regarding crown pillar extraction in the norther portion of Boliden Tara Mines. It was conducted in two phases – first a continuum model was analyzed in FLAC3D, which was then followed by a discontinuum modelling in 3DEC with included faults.

Practical Open Pit Rock Mechanics (2017)

Open pit mining often result in high rock slopes, sometimes combined with difficult rock conditions. This is further augmented by large blasting rounds resulting in high vibrations. Reinforcement of pit slope walls is also difficult and many times associated with high costs and loss of production. Bench slope stability is vital for a safe working place for all personnel in the mine as well as for avoiding production loss. Itasca Consultants AB is providing technical, on-site rock mechanics expertise to several open pit mines in northern Sweden.

Modeling and Calibration of a Blocky Granite Rock (2017)

In the framework of the development of a subsea tidal turbine, the design of the foundations has to be optimal. Cathie Associates, on behalf of HydroQuest, wanted us to investigate the penetration of a single steel foundation pin in a granitic rock mass by using a discrete numerical approach and follow the state of the damaged zone around the tip during penetration.

Modelling concrete slab on rigid inclusion reinforced soil (2017)

In the context of a wine cellar extension project, a 20cm thick concrete slab is to be constructed on a soil reinforced by rigid inclusions. Itasca France has been called by the design office to verify the mechanical resistance of the concrete slab and assess its settlement under a uniform load.

Investigating the mechanical behavior of a surface repository for low and intermediatelevel short-lived radioactive waste (2017)

Andra operates a surface repository in Aube (“CSA”, North‐Eastern France), where some of the concrete canisters containing low and intermediate‐level short‐lived radioactive waste are stacked in concrete structures, then filled with gravel (Fig 1). ITASCA Consultants SAS, together with EGIS Industries, has studied the mechanical behavior of the assemblies, in the framework of design and safety demonstration programs.

Numerical modeling of dredged sand filled geotextile tubes behavior under seismic loading (2016)

A nearshore 120m long causeway is planned for the Mozambique LNG TMOF Project. Geosintex S.R.L. proposes a structure composed by synthetic geotubes (see Figure) for protecting the road against erosion. The mechanical behavior of this structure must be understood better. The evaluation of the potential for liquefaction of the road sandy basement and the geotubes filling material is of particular interest.

Liquefaction Risk Mitigation using Jet Grouting Cells (2016)

Trevi Group has been involved in the design-build of a commercial building in Turkey in an area prone to liquefaction. The foundation of the building is located approximately 10 m below original grade, which still leaves about 10-12 m of potentially liquefiable sand underneath the bottom slab.

Discrete modelling of lime kilns (2016)

KERNEOS Aluminate Technologies wishes to exploit the bauxite fines generated during the extraction, conditioning and transport of bulk bauxite, which are currently unused. To achieve this objective, the PARC project was built around 2 academics and 4 industrial companies, experts in their field.

1 2 3 4 5 6
Senaste nytt